Node data: when 0-24, the final force is 5+PB; The new calculation power of 1T on the day; When the sunrise block number 4; Block reward: 78FIL; Storage revenue per T: 0.0142FIL/T (average revenue per T within 223 days is 0.0159FIL, currently the network average revenue per T is 0.0137FIL).

作者 fil lover

zh_CNChinese